πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Skelton Grange ERF

Former Skelton Grange Power Station Site, Pontefract Lane, Newsam Green, Leeds,, West Yorkshire

Skelton Grange ERF is a 26 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Biffa. The scheme is currently in the planning system, submitted September 2011. The determining authority is Leeds, reference 11/03705/FU.…

Revised
Project stageSuperseded by a new application
  1. PlanningSep 2011 (completed)
  2. Superseded by a new application (project stopped here)
  3. ConsentedFeb 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2017-03-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

26.000 MW
Registered Capacity

πŸ“‹ Project Overview

Skelton Grange ERF is a 26 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Biffa. The scheme is currently in the planning system, submitted September 2011. The determining authority is Leeds, reference 11/03705/FU.

πŸ”§ Technical Specifications

Capacity (MW)26.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBiffa
Owner / operatorBiffa
Year consented2013
LocationFormer Skelton Grange Power Station Site, Pontefract Lane, Newsam Green, Leeds,, West Yorkshire
RegionYorkshire and Humber
Coordinates53.7763614Β°N, 1.4977632Β°W

Additional published register fields

Registered technologyEfW Incineration
Are they re-applying (New REPD Ref)10448

πŸ“… Project Timeline

2011-09-27
2013-02-08