Sinton End Farm, Acton Beauchamp, Worcester, Herefordshire, WR6 5AE
Sinton End Farm, Acton Beauchamp - Solar Farm is a 20 MW solar farm project in West Midlands. The applicant or operator on record is Sintons End Solar Farm Limited. The planning application was refused. The determining authority is Herefordshire, County of, reference P243282/F.β¦
Refused
Project stageRefused
PlanningJul 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-12-02.
Registered planning capacity; not measured generation.
Sinton End Farm, Acton Beauchamp - Solar Farm is a 20 MW solar farm project in West Midlands. The applicant or operator on record is Sintons End Solar Farm Limited. The planning application was refused. The determining authority is Herefordshire, County of, reference P243282/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Sintons End Solar Farm Limited
Owner / operator
Sintons End Solar Farm Limited
Location
Sinton End Farm, Acton Beauchamp, Worcester, Herefordshire, WR6 5AE