Shelford WTE Plant

Broad Oak Road, Canterbury, Kent, Kent

Shelford WTE Plant is a 16.1 MW bioenergy / waste project in South East. The applicant or operator on record is ENERGY DEVELOPMENTS (UK) LTD. The application has been withdrawn or the scheme abandoned. The determining authority is Canterbury, reference CA/02/01349.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2005-08-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

16.100 MW
Registered Capacity

πŸ“‹ Project Overview

Shelford WTE Plant is a 16.1 MW bioenergy / waste project in South East. The applicant or operator on record is ENERGY DEVELOPMENTS (UK) LTD. The application has been withdrawn or the scheme abandoned. The determining authority is Canterbury, reference CA/02/01349.

πŸ”§ Technical Specifications

Capacity (MW)16.100 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperENERGY DEVELOPMENTS (UK) LTD
Owner / operatorENERGY DEVELOPMENTS (UK) LTD
LocationBroad Oak Road, Canterbury, Kent, Kent
RegionSouth East
Coordinates51.2990294Β°N, 1.0970657Β°E

Additional published register fields

Registered technologyEfW Incineration

πŸ“… Project Timeline

2002-10-14