Sheirdrim Windfarm East Of, Clachan, Tarbert, Strathclyde, Strathclyde, PA29 6
Sheirdrim Renewable Energy Development - Solar is a 20 MW solar farm project in Scotland. The applicant or operator on record is ScottishPower Renewables. The planning application was refused. The determining authority is Scottish Government (S36), reference ECU00001957.β¦
Refused
Project stageRefused
PlanningOct 2019 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2023-06-26.
Registered planning capacity; not measured generation.
Sheirdrim Renewable Energy Development - Solar is a 20 MW solar farm project in Scotland. The applicant or operator on record is ScottishPower Renewables. The planning application was refused. The determining authority is Scottish Government (S36), reference ECU00001957.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
ScottishPower Renewables
Owner / operator
ScottishPower Renewables
Location
Sheirdrim Windfarm East Of, Clachan, Tarbert, Strathclyde, Strathclyde, PA29 6