Sheildaig Hydro Project is a 2.1 MW conventional hydro project in Scotland. The applicant or operator on record is Highland Light and Power. The planning application was refused. The determining authority is Highland.…

Refused
Project stageRefused
  1. PlanningMay 2003 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2005-03-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.100 MW
Registered Capacity

πŸ“‹ Project Overview

Sheildaig Hydro Project is a 2.1 MW conventional hydro project in Scotland. The applicant or operator on record is Highland Light and Power. The planning application was refused. The determining authority is Highland.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 2.100 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.100 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperHighland Light and Power
Owner / operatorHighland Light and Power
LocationGairloch, Highland, Highland
RegionScotland
Coordinates57.7368436Β°N, 5.6807083Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline