πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Other Registered Technology

Severn Road Resource Recovery Centre (Avonmouth RRC)

Part Of Former Sevalco Site, Chittening Road, Bristol, South Gloucestershire, Avon, BS11 0YU

Severn Road Resource Recovery Centre (Avonmouth RRC) is a 12 MW other registered technology project in South West. The applicant or operator on record is Avon Power. The application has been withdrawn or the scheme abandoned. The determining authority is Bristol, City of, referen…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJan 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-12-09.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

12.000 MW
Registered Capacity

πŸ“‹ Project Overview

Severn Road Resource Recovery Centre (Avonmouth RRC) is a 12 MW other registered technology project in South West. The applicant or operator on record is Avon Power. The application has been withdrawn or the scheme abandoned. The determining authority is Bristol, City of, reference 14/03974/F.

πŸ”§ Technical Specifications

Capacity (MW)12.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAvon Power
Owner / operatorAvon Power
Year consented2015
LocationPart Of Former Sevalco Site, Chittening Road, Bristol, South Gloucestershire, Avon, BS11 0YU
RegionSouth West
Coordinates51.5311117Β°N, 2.6717826Β°W

Additional published register fields

Registered technologyAdvanced Conversion Technologies

πŸ“… Project Timeline

2014-08-20
2015-01-13