πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Selkirk Wastewater Treatment Works, Riverside Road - Solar Array

Sewage Treatment Works Riverside Road, Borders, TD7 5DU

Selkirk Wastewater Treatment Works, Riverside Road - Solar Array is a 0.25 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water Horizons. The scheme is currently in the planning system, submitted May 2026. The determining authority is Scottish …

In Planning
Project stageIn planning
  1. PlanningMay 2026 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated date not supplied.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.250 MW
Registered Capacity

πŸ“‹ Project Overview

Selkirk Wastewater Treatment Works, Riverside Road - Solar Array is a 0.25 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water Horizons. The scheme is currently in the planning system, submitted May 2026. The determining authority is Scottish Borders, reference 26/00684/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.25 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.250 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperScottish Water Horizons
Owner / operatorScottish Water Horizons
LocationSewage Treatment Works Riverside Road, Borders, TD7 5DU
RegionScotland
Coordinates55.5524576Β°N, 2.8469373Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)13600

πŸ“… Project Timeline

2026-05-07