Sefter Farm, Pagham Road, Bognor Regis, West Sussex, PO21 3PX
Sefter Farm, Pagham Road - Solar Panels is a 2 MW solar farm project in South East. The applicant or operator on record is Barfoots Of Botley Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Arun, refβ¦
Consented / Approved
Project stageConsented
PlanningJun 2023 (completed)
ConsentedSep 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-10-04.
Registered planning capacity; not measured generation.
Sefter Farm, Pagham Road - Solar Panels is a 2 MW solar farm project in South East. The applicant or operator on record is Barfoots Of Botley Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Arun, reference P/60/23/PL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
2.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Barfoots Of Botley Limited
Owner / operator
Barfoots Of Botley Limited
Year consented
2023
Location
Sefter Farm, Pagham Road, Bognor Regis, West Sussex, PO21 3PX