πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Schoeller Allibert Limited, Road One - Solar Panels System

Schoeller Allibert Limited, Road One, Winsford, Cheshire, CW7 3RA

Schoeller Allibert Limited, Road One - Solar Panels System is a 2.2 MW solar farm project in North West. The applicant or operator on record is Schoeller Allibert Limited. Planning permission has been granted as of January 2023 and it is awaiting construction. The determining aut…

Consented / Approved
2 MW
Installed Capacity

πŸ“‹ Project Overview

Schoeller Allibert Limited, Road One - Solar Panels System is a 2.2 MW solar farm project in North West. The applicant or operator on record is Schoeller Allibert Limited. Planning permission has been granted as of January 2023 and it is awaiting construction. The determining authority is Cheshire West and Chester, reference 22/01832/FUL.

Site Schematic

SUBSTATION ? ha Β· 2.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSchoeller Allibert Limited
Owner / operatorSchoeller Allibert Limited
Year consented2023
LocationSchoeller Allibert Limited, Road One, Winsford, Cheshire, CW7 3RA
RegionNorth West
Coordinates53.1956972Β°N, 2.4943896Β°W

πŸ“… Project Timeline