πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Offshore Wind

Scarweather Sands

5.5km Sker Point (nr Porthcawl), Offshore

Scarweather Sands is a 108 MW offshore wind project in Offshore. The applicant or operator on record is E.On / Energie 2. The application has been withdrawn or the scheme abandoned. The determining authority is DECC (S36).…

Withdrawn
Project stageWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2010-01-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

108.000 MW
Registered Capacity

πŸ“‹ Project Overview

Scarweather Sands is a 108 MW offshore wind project in Offshore. The applicant or operator on record is E.On / Energie 2. The application has been withdrawn or the scheme abandoned. The determining authority is DECC (S36).

Site Schematic

β—„ SHORE (~? km) NORTH SEA / OFFSHORE Turbine () Export cable

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)108.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperE.On / Energie 2
Owner / operatorE.On / Energie 2
Location5.5km Sker Point (nr Porthcawl), Offshore
RegionOffshore
Coordinates51.4282766Β°N, 3.8368051Β°W

Additional published register fields

Registered technologyWind Offshore
Turbine Capacity (MW)3
No. of Turbines30