SC Johnson Denby Hall Way Denby Ripley, Derbyshire, DE5 8JZ
SC Johnson, Denby - Solar Panels is a 0.62 MW solar farm project in East Midlands. The applicant or operator on record is SC Johnson Professional Limited. It is recorded as under construction since August 2022. The determining authority is Amber Valley, reference PDR/2022/0028.β¦
Under Construction
Project stageUnder construction
PlanningMay 2022 (completed)
ConsentedSep 2022 (completed)
ConstructionAug 2022 (current stage)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Under Construction.
Official register: July 2026
Recorded status: Under Construction. Source record updated 2022-06-08.
Registered planning capacity; not measured generation.
SC Johnson, Denby - Solar Panels is a 0.62 MW solar farm project in East Midlands. The applicant or operator on record is SC Johnson Professional Limited. It is recorded as under construction since August 2022. The determining authority is Amber Valley, reference PDR/2022/0028.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.620 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
SC Johnson Professional Limited
Owner / operator
SC Johnson Professional Limited
Year consented
2022
Construction started
2022
Location
SC Johnson Denby Hall Way Denby Ripley, Derbyshire, DE5 8JZ