πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Samye Ling Centre - Solar Panels

Samye Ling Centre, Eskdalemuir, Langholm, Dumfries and Galloway, DG13 0QL

Samye Ling Centre - Solar Panels is a 0.3 MW solar farm project in Scotland. The applicant or operator on record is Kagyu Samye Ling Tibetan Centre. Planning permission has been granted as of July 2024 and it is awaiting construction. The determining authority is Dumfries and Gal…

Consented / Approved
Project stageConsented
  1. PlanningMar 2024 (completed)
  2. ConsentedJul 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-07-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.300 MW
Registered Capacity

πŸ“‹ Project Overview

Samye Ling Centre - Solar Panels is a 0.3 MW solar farm project in Scotland. The applicant or operator on record is Kagyu Samye Ling Tibetan Centre. Planning permission has been granted as of July 2024 and it is awaiting construction. The determining authority is Dumfries and Galloway, reference 24/0533/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperKagyu Samye Ling Tibetan Centre
Owner / operatorKagyu Samye Ling Tibetan Centre
Year consented2024
LocationSamye Ling Centre, Eskdalemuir, Langholm, Dumfries and Galloway, DG13 0QL
RegionScotland
Coordinates55.2890381Β°N, 3.1884959Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)4560

πŸ“… Project Timeline

2024-03-14
2024-07-17