πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Salford Road Solar Farm

Former CMP/GNB Batteries Ltd, Salford Road, Bolton, Greater Manchester, BL5 1DG

Salford Road Solar Farm is a 2.2 MW solar farm project in North West. The applicant or operator on record is Greater Manchester Waste Disposal Authority. The scheme is currently in the planning system, submitted October 2014. The determining authority is Bolton, reference 92938/1…

Revised
Project stageSuperseded by a new application
  1. PlanningOct 2014 (completed)
  2. Superseded by a new application (project stopped here)
  3. ConsentedDec 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2015-06-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.200 MW
Registered Capacity

πŸ“‹ Project Overview

Salford Road Solar Farm is a 2.2 MW solar farm project in North West. The applicant or operator on record is Greater Manchester Waste Disposal Authority. The scheme is currently in the planning system, submitted October 2014. The determining authority is Bolton, reference 92938/14.

Site Schematic

SUBSTATION ? ha Β· 2.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreater Manchester Waste Disposal Authority
Owner / operatorGreater Manchester Waste Disposal Authority
Year consented2014
LocationFormer CMP/GNB Batteries Ltd, Salford Road, Bolton, Greater Manchester, BL5 1DG
RegionNorth West
Coordinates53.5392452Β°N, 2.4464783Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Are they re-applying (New REPD Ref)5303
Solar Site Area (sqm)38000

πŸ“… Project Timeline

2014-10-14
2014-12-22