Rufford Solar Farm is a 5 MW solar farm project in East Midlands. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is Newark and Sherwood, reference 15/01008/FULM.β¦
Refused
Project stageRefused
PlanningSep 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-12-16.
Registered planning capacity; not measured generation.
Rufford Solar Farm is a 5 MW solar farm project in East Midlands. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is Newark and Sherwood, reference 15/01008/FULM.