Solar Farm

Royston Solar Farm (Phase 2)

Land between Railway and Sewage Disposal Works, Royston Road, Melbourn, Cambridgeshire, Cambridgeshire

Royston Solar Farm (Phase 2) is a 4 MW solar farm project in Eastern. The applicant or operator on record is Canadian Solar. The planning permission has expired. The determining authority is South Cambridgeshire, reference S/1427/14/FL.…

Expired
Project stageConsent lapsed
  1. PlanningJul 2014 (completed)
  2. ConsentedOct 2014 (completed)
  3. Consent lapsed (project stopped here)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Expired.

Official register: July 2026

Recorded status: Planning Permission Expired. Source record updated 2017-11-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.000 MW
Registered Capacity

πŸ“‹ Project Overview

Royston Solar Farm (Phase 2) is a 4 MW solar farm project in Eastern. The applicant or operator on record is Canadian Solar. The planning permission has expired. The determining authority is South Cambridgeshire, reference S/1427/14/FL.

Site Schematic

SUBSTATION ? ha Β· 4 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCanadian Solar
Owner / operatorCanadian Solar
Year consented2014
LocationLand between Railway and Sewage Disposal Works, Royston Road, Melbourn, Cambridgeshire, Cambridgeshire
RegionEastern
Coordinates52.0650233Β°N, 0.0223099Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)262500

πŸ“… Project Timeline

2014-07-01
2014-10-29