Solar Farm

Royals Wood Farm

Land South Of Royals Wood Farm, Whitchurch, Aston, Cheshire, CW5 8DN

Royals Wood Farm is a 5 MW solar farm project in North West. The applicant or operator on record is INRG Solar. The application has been withdrawn or the scheme abandoned. The determining authority is Cheshire East, reference 15/3380N.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-01-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Royals Wood Farm is a 5 MW solar farm project in North West. The applicant or operator on record is INRG Solar. The application has been withdrawn or the scheme abandoned. The determining authority is Cheshire East, reference 15/3380N.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperINRG Solar
Owner / operatorINRG Solar
LocationLand South Of Royals Wood Farm, Whitchurch, Aston, Cheshire, CW5 8DN
RegionNorth West
Coordinates53.0038781Β°N, 2.5964032Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)82000

πŸ“… Project Timeline

2015-08-11