πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Roves Farm

Roves Farm, Roves Lane, Swindon,, Wiltshire, SN6 7QF

Roves Farm is a 2 MW bioenergy / waste project in South West. The applicant or operator on record is Unknown. The application has been withdrawn or the scheme abandoned. The determining authority is Swindon, reference S/06/1753.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2011-08-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Roves Farm is a 2 MW bioenergy / waste project in South West. The applicant or operator on record is Unknown. The application has been withdrawn or the scheme abandoned. The determining authority is Swindon, reference S/06/1753.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperUnknown
Owner / operatorUnknown
Year consented2006
LocationRoves Farm, Roves Lane, Swindon,, Wiltshire, SN6 7QF
RegionSouth West
Coordinates51.6128737Β°N, 1.7067675Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2006-08-15
2006-11-13