π Project Overview
Roughmute Sewage Treatment Works - Solar Panels is a 0.81 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water National Operations Control Centre. Planning permission has been granted as of November 2022 and it is awaiting construction. The determining authority is Falkirk, reference P/22/0436/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Scottish Water National Operations Control Centre |
| Owner / operator | Scottish Water National Operations Control Centre |
| Year consented | 2022 |
| Location | Roughmute Sewage Treatment Works Larbert, Stirling, FK5 3NP |
| Region | Scotland |
| Coordinates | 56.0086696Β°N, 3.8686697Β°W |