Roughmute Sewage Treatment Works Larbert, Stirling, FK5 3NP
Roughmute Sewage Treatment Works - Solar Panels is a 0.81 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water National Operations Control Centre. Planning permission has been granted as of November 2022 and it is awaiting construction. The detβ¦
Consented / Approved
Project stageConsented
PlanningSep 2022 (completed)
ConsentedNov 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-11-09.
Registered planning capacity; not measured generation.
Roughmute Sewage Treatment Works - Solar Panels is a 0.81 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water National Operations Control Centre. Planning permission has been granted as of November 2022 and it is awaiting construction. The determining authority is Falkirk, reference P/22/0436/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.810 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Scottish Water National Operations Control Centre
Owner / operator
Scottish Water National Operations Control Centre
Year consented
2022