Land East Of Scurf Dyke Farm Watton Carrs Road Hutton Cranswick East Riding Of Yorkshire, Humberside
Rotsea Wind Farm is a 6.9 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is East Riding of Yorkshire, reference 13/03606/STPLFE.β¦
Refused
Project stageRefused
PlanningNov 2013 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-12-02.
Registered planning capacity; not measured generation.
Rotsea Wind Farm is a 6.9 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is East Riding of Yorkshire, reference 13/03606/STPLFE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Renewable Energy Systems (RES)
Owner / operator
Renewable Energy Systems (RES)
Location