Rothesay Waste Water Treatment Works, Rothesay, Isle of Bute, Argyll and Bute, PA20 9LH
Rothesay Waste Water Treatment - Solar Panels is a 0.26 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water National Operations Control Centre. Planning permission has been granted as of August 2024 and it is awaiting construction. The determiβ¦
Consented / Approved
Project stageConsented
PlanningFeb 2024 (completed)
ConsentedAug 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2024-09-09.
Registered planning capacity; not measured generation.
Rothesay Waste Water Treatment - Solar Panels is a 0.26 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water National Operations Control Centre. Planning permission has been granted as of August 2024 and it is awaiting construction. The determining authority is Argyll and Bute, reference 24/00329/PP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.260 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Scottish Water National Operations Control Centre
Owner / operator
Scottish Water National Operations Control Centre
Year consented
2024