Roding Lane South - Solar Panels is a 0.22 MW solar farm project in London. The applicant or operator on record is Interlink Direct. Planning permission has been granted as of December 2022 and it is awaiting construction. The determining authority is Redbridge, reference 3477/22β¦
Consented / Approved
Project stageConsented
PlanningOct 2022 (completed)
ConsentedDec 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-01-24.
Registered planning capacity; not measured generation.
Roding Lane South - Solar Panels is a 0.22 MW solar farm project in London. The applicant or operator on record is Interlink Direct. Planning permission has been granted as of December 2022 and it is awaiting construction. The determining authority is Redbridge, reference 3477/22.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.