Land Off, Tamerton Road, Woolwell, Plymouth, Devon, PL6 7BQ
Roborough Solar Farm is a 2.65 MW solar farm project in South West. The applicant or operator on record is Regener8 Power (South Hampshire). Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is Plymouth, reference 407β¦
Consented / Approved
Project stageConsented
PlanningNov 2022 (completed)
ConsentedMar 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-03-28.
Registered planning capacity; not measured generation.
Roborough Solar Farm is a 2.65 MW solar farm project in South West. The applicant or operator on record is Regener8 Power (South Hampshire). Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is Plymouth, reference 4072/22/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
2.650 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Regener8 Power (South Hampshire)
Owner / operator
Regener8 Power (South Hampshire)
Year consented
2023
Location