Unit H Rivermead Drive Rivermead Industrial Estate, Wiltshire, SN5 7EX
Rivermead Drive, Rivermead Industrial Estate - Solar Panels is a 0.23 MW solar farm project in South West. The applicant or operator on record is Uni-Mill Engineering Limited. Planning permission has been granted as of November 2022 and it is awaiting construction. The determininβ¦
Consented / Approved
Project stageConsented
PlanningSep 2022 (completed)
ConsentedNov 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-11-15.
Registered planning capacity; not measured generation.
Rivermead Drive, Rivermead Industrial Estate - Solar Panels is a 0.23 MW solar farm project in South West. The applicant or operator on record is Uni-Mill Engineering Limited. Planning permission has been granted as of November 2022 and it is awaiting construction. The determining authority is Swindon, reference S/PSOLP/22/1429.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.230 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Uni-Mill Engineering Limited
Owner / operator
Uni-Mill Engineering Limited
Year consented
2022
Location
Unit H Rivermead Drive Rivermead Industrial Estate, Wiltshire, SN5 7EX