Riverford Farm, Zc88 at A384 to Staverton Brid, Staverton, Totnes, Devon, Devon, TQ9 6AF
Riverford Farm is a 49.9 MW battery storage project in South West. The applicant or operator on record is Abham Storage / Statera Energy. The planning permission has expired. The determining authority is South Hams, reference 3360/17/FUL.β¦
Expired
Project stageConsent lapsed
PlanningOct 2017 (completed)
ConsentedDec 2017 (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2020-08-21.
Registered planning capacity; not measured generation.
Riverford Farm is a 49.9 MW battery storage project in South West. The applicant or operator on record is Abham Storage / Statera Energy. The planning permission has expired. The determining authority is South Hams, reference 3360/17/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Abham Storage / Statera Energy
Owner / operator
Abham Storage / Statera Energy
Year consented
2017
Location
Riverford Farm, Zc88 at A384 to Staverton Brid, Staverton, Totnes, Devon, Devon, TQ9 6AF