Conventional Hydro

River Calder Hydro Scheme

Clyde Muirshiel, Regional Park-Renfrewshire, Lochwinnoch, Strathclyde, Renfrewshire, PA12

River Calder Hydro Scheme is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Ashrona Power Systems. The planning application was refused. The determining authority is Renfrewshire, reference 18/0836/PP.…

Refused
Project stageRefused
  1. PlanningDec 2018 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2019-09-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

River Calder Hydro Scheme is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Ashrona Power Systems. The planning application was refused. The determining authority is Renfrewshire, reference 18/0836/PP.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 2.000 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAshrona Power Systems
Owner / operatorAshrona Power Systems
LocationClyde Muirshiel, Regional Park-Renfrewshire, Lochwinnoch, Strathclyde, Renfrewshire, PA12
RegionScotland
Coordinates55.824838Β°N, 4.6838491Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2018-12-13