River Calder Hydro Scheme is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Ashrona Power Systems. The planning application was refused. The determining authority is Renfrewshire, reference 18/0836/PP.β¦
Refused
Project stageRefused
PlanningDec 2018 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2019-09-20.
Registered planning capacity; not measured generation.
River Calder Hydro Scheme is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Ashrona Power Systems. The planning application was refused. The determining authority is Renfrewshire, reference 18/0836/PP.