LAND NORTH-WEST OF RITHERDENS FARM, BRADFORD ON TONE, Somerset
RITHERDENS FARM solar park is a 9.5 MW solar farm project in South West. The applicant or operator on record is MS POWER PROJECTS LIMITED. The planning application was refused. The determining authority is Somerset, reference 07/13/0016.β¦
Refused
Project stageRefused
PlanningMay 2013 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2013-09-23.
Registered planning capacity; not measured generation.
RITHERDENS FARM solar park is a 9.5 MW solar farm project in South West. The applicant or operator on record is MS POWER PROJECTS LIMITED. The planning application was refused. The determining authority is Somerset, reference 07/13/0016.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
9.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
MS POWER PROJECTS LIMITED
Owner / operator
MS POWER PROJECTS LIMITED
Location
LAND NORTH-WEST OF RITHERDENS FARM, BRADFORD ON TONE, Somerset