Solar Farm

Registry Twyver House, Bruton Way - Solar Panels

Registry Twyver House Bruton Way, Gloucestershire, GL1 1DQ

Registry Twyver House, Bruton Way - Solar Panels is a 8.8 MW solar farm project in South West. The applicant or operator on record is Unknown. The application has been withdrawn or the scheme abandoned. The determining authority is Gloucester, reference 22/01202/SOLAR.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningFeb 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2023-03-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.800 MW
Registered Capacity

πŸ“‹ Project Overview

Registry Twyver House, Bruton Way - Solar Panels is a 8.8 MW solar farm project in South West. The applicant or operator on record is Unknown. The application has been withdrawn or the scheme abandoned. The determining authority is Gloucester, reference 22/01202/SOLAR.

Site Schematic

SUBSTATION ? ha Β· 8.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)8.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperUnknown
Owner / operatorUnknown
LocationRegistry Twyver House Bruton Way, Gloucestershire, GL1 1DQ
RegionSouth West
Coordinates51.8647184Β°N, 2.2396014Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2023-02-02