Red House Farm Doncaster Road High Melton Doncaster, South Yorkshire, DN5 7SU
Red House Farm, High Melton -Solar Panels is a 0.16 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Private Developer. Planning permission has been granted as of September 2022 and it is awaiting construction. The determining authority is Donβ¦
Consented / Approved
Project stageConsented
PlanningMay 2022 (completed)
ConsentedSep 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-11-28.
Registered planning capacity; not measured generation.
Red House Farm, High Melton -Solar Panels is a 0.16 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Private Developer. Planning permission has been granted as of September 2022 and it is awaiting construction. The determining authority is Doncaster, reference 22/01274/PRIOR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.160 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Private Developer
Owner / operator
Private Developer
Year consented
2022
Location
Red House Farm Doncaster Road High Melton Doncaster, South Yorkshire, DN5 7SU