Red Bull Racing Wind Tunnel, Sherbourne Drive – Solar Panels is a 0.29 MW solar farm project in South East. The applicant or operator on record is Red Bull Racing Limited. It is recorded as under construction since June 2026. The determining authority is Milton Keynes, referenc…
Under Construction
Project stageUnder construction
PlanningMar 2024 (completed)
ConsentedApr 2026 (completed)
ConstructionJun 2026 (current stage)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Under Construction.
Official register: July 2026
Recorded status: Under Construction. Source record updated date not supplied.
Registered planning capacity; not measured generation.
Red Bull Racing Wind Tunnel, Sherbourne Drive – Solar Panels is a 0.29 MW solar farm project in South East. The applicant or operator on record is Red Bull Racing Limited. It is recorded as under construction since June 2026. The determining authority is Milton Keynes, reference 24/00397/FUL.
Site Schematic
Schematic diagram — not to scale. Illustrative layout based on project specifications.