Solar Farm

Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels

16 Bradbourne Drive, Tilbrook, Milton Keynes, Buckinghamshire, MK7 8BJ

Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels is a 0.33 MW solar farm project in South East. The applicant or operator on record is Red Bull Powertrains 2026 Limited. It is recorded as operational since January 2024. The determining authority is Mil…

Operational · Since 2024
Project stageOperating
  1. PlanningAug 2022 (completed)
  2. ConsentedSep 2023 (completed)
  3. Construction (completed)
  4. OperatingJan 2024 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated date not supplied.

Registered planning capacity; not measured generation.

DESNZ source publication · Search the full register · Definitions and coverage

0.330 MW
Registered Capacity
2024
Commissioned

📋 Project Overview

Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels is a 0.33 MW solar farm project in South East. The applicant or operator on record is Red Bull Powertrains 2026 Limited. It is recorded as operational since January 2024. The determining authority is Milton Keynes, reference 22/01960/FUL.

Site Schematic

SUBSTATION ? ha · 0.33 MW · ? panels

Schematic diagram — not to scale. Illustrative layout based on project specifications.

🔧 Technical Specifications

Capacity (MW)0.330 MW

🔌 Grid Connection & Infrastructure

🏢 Development & Ownership

DeveloperRed Bull Powertrains 2026 Limited
Owner / operatorRed Bull Powertrains 2026 Limited
Year consented2023
Commissioned / target2024
Location16 Bradbourne Drive, Tilbrook, Milton Keynes, Buckinghamshire, MK7 8BJ
RegionSouth East
Coordinates52.0094458°N, 0.6907412°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

📅 Project Timeline

2022-08-05
2023-09-13
2024-01-01