Shoreham Technical Centre, Reception, Old Shoreham Road, Lancing, Shoreham by Sea, West Sussex, BN43 5FG
Reception Shoreham Technical Centre - Solar PV Panel Panels is a 0.21 MW solar farm project in South East. The applicant or operator on record is Ricardo Consulting Engineering Limited. Planning permission has been granted as of June 2024 and it is awaiting construction. The deteβ¦
Consented / Approved
Project stageConsented
PlanningFeb 2024 (completed)
ConsentedJun 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2024-07-18.
Registered planning capacity; not measured generation.
Reception Shoreham Technical Centre - Solar PV Panel Panels is a 0.21 MW solar farm project in South East. The applicant or operator on record is Ricardo Consulting Engineering Limited. Planning permission has been granted as of June 2024 and it is awaiting construction. The determining authority is Adur, reference NOTICE/0023/23.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.210 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ricardo Consulting Engineering Limited
Owner / operator
Ricardo Consulting Engineering Limited
Year consented
2024
Location
Shoreham Technical Centre, Reception, Old Shoreham Road, Lancing, Shoreham by Sea, West Sussex, BN43 5FG