Rayleigh Transforming Station, High Mead, Rayleigh, Essex, Essex, SS6 7AW
Rayleigh Transforming Station is a 10.8 MW battery storage project in Eastern. The applicant or operator on record is Aura Power / South East Grid Storage Two. The planning permission has expired. The determining authority is Rochford, reference 17/00437/FUL.β¦
Expired
Project stageConsent lapsed
PlanningMay 2017 (completed)
ConsentedAug 2017 (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2020-03-23.
Registered planning capacity; not measured generation.
Rayleigh Transforming Station is a 10.8 MW battery storage project in Eastern. The applicant or operator on record is Aura Power / South East Grid Storage Two. The planning permission has expired. The determining authority is Rochford, reference 17/00437/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.800 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Aura Power / South East Grid Storage Two
Owner / operator
Aura Power / South East Grid Storage Two
Year consented
2017
Location
Rayleigh Transforming Station, High Mead, Rayleigh, Essex, Essex, SS6 7AW