Radcliffe Road, Holme Pierrepont - Solar Farm is a 4.2 MW solar farm project in East Midlands. The applicant or operator on record is Bassingfield REP Limited. Planning permission has been granted as of December 2022 and it is awaiting construction. The determining authority is Rushcliffe, reference 22/01511/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 4 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Bassingfield REP Limited |
| Owner / operator | Bassingfield REP Limited |
| Year consented | 2022 |
| Location | South Of Radcliffe Road Holme Pierrepont, Nottinghamshire, NG12 2LT |
| Region | East Midlands |