South Of Radcliffe Road Holme Pierrepont, Nottinghamshire, NG12 2LT
Radcliffe Road, Holme Pierrepont - Solar Farm is a 4.2 MW solar farm project in East Midlands. The applicant or operator on record is Bassingfield REP Limited. Planning permission has been granted as of December 2022 and it is awaiting construction. The determining authority is Rβ¦
Consented / Approved
Project stageConsented
PlanningSep 2022 (completed)
ConsentedDec 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-01-03.
Registered planning capacity; not measured generation.
Radcliffe Road, Holme Pierrepont - Solar Farm is a 4.2 MW solar farm project in East Midlands. The applicant or operator on record is Bassingfield REP Limited. Planning permission has been granted as of December 2022 and it is awaiting construction. The determining authority is Rushcliffe, reference 22/01511/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
4.200 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Bassingfield REP Limited
Owner / operator
Bassingfield REP Limited
Year consented
2022