πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Quorum Building, Benton Lane - Solar Panels

First Floor Quorum Building 1 Quorum Business Park Benton Lane Longbenton, Tyne And Wear, NE12 8EX

Quorum Building, Benton Lane - Solar Panels is a 0.2 MW solar farm project in North East. The applicant or operator on record is TDR Training. Planning permission has been granted as of March 2026 and it is awaiting construction. The determining authority is North Tyneside, refe…

Consented / Approved
Project stageConsented
  1. PlanningFeb 2026 (completed)
  2. ConsentedMar 2026 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-05-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Registered Capacity

πŸ“‹ Project Overview

Quorum Building, Benton Lane - Solar Panels is a 0.2 MW solar farm project in North East. The applicant or operator on record is TDR Training. Planning permission has been granted as of March 2026 and it is awaiting construction. The determining authority is North Tyneside, reference 26/00144/PRIOTH.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTDR Training
Owner / operatorTDR Training
Year consented2026
LocationFirst Floor Quorum Building 1 Quorum Business Park Benton Lane Longbenton, Tyne And Wear, NE12 8EX
RegionNorth East
Coordinates55.0192784Β°N, 1.5838425Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2026-02-02