πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Quorum Building, Benton Lane - Solar Panels

First Floor Quorum Building 1 Quorum Business Park Benton Lane Longbenton, Tyne And Wear, NE12 8EX

Quorum Building, Benton Lane - Solar Panels is a 0.2 MW solar farm project in North East. The applicant or operator on record is TDR Training. The scheme is currently in the planning system, submitted February 2026. The determining authority is North Tyneside, reference 26/00144…

In Planning
0 MW
Installed Capacity

πŸ“‹ Project Overview

Quorum Building, Benton Lane - Solar Panels is a 0.2 MW solar farm project in North East. The applicant or operator on record is TDR Training. The scheme is currently in the planning system, submitted February 2026. The determining authority is North Tyneside, reference 26/00144/PRIOTH.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTDR Training
Owner / operatorTDR Training
LocationFirst Floor Quorum Building 1 Quorum Business Park Benton Lane Longbenton, Tyne And Wear, NE12 8EX
RegionNorth East
Coordinates55.0192784Β°N, 1.5838425Β°W

πŸ“… Project Timeline