πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

PwllfaWatkin AD Plant (Waste AD)

Pwllfawatkibernant Colliery, Pontardawe, West Glamorgan

PwllfaWatkin AD Plant (Waste AD) is a 2.3 MW bioenergy / waste project in Wales. The applicant or operator on record is Waste Recycling Group. The application has been withdrawn or the scheme abandoned. The determining authority is Neath Port Talbot, reference P2011/1063.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2013-01-28.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.300 MW
Registered Capacity

πŸ“‹ Project Overview

PwllfaWatkin AD Plant (Waste AD) is a 2.3 MW bioenergy / waste project in Wales. The applicant or operator on record is Waste Recycling Group. The application has been withdrawn or the scheme abandoned. The determining authority is Neath Port Talbot, reference P2011/1063.

πŸ”§ Technical Specifications

Capacity (MW)2.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWaste Recycling Group
Owner / operatorWaste Recycling Group
LocationPwllfawatkibernant Colliery, Pontardawe, West Glamorgan
RegionWales
Coordinates51.7561038Β°N, 3.8888979Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2012-04-11