πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Prologis Park, Unit B - Solar Panels

Prologis Park, Unit B, Green Lane, Hounslow, London, TW4 6ER

Prologis Park, Unit B - Solar Panels is a 0.99 MW solar farm project in London. The applicant or operator on record is Redcentric. The planning application was refused. The determining authority is Hounslow, reference P/2024/1582.…

Refused
Project stageRefused
  1. PlanningMay 2024 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2024-07-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.990 MW
Registered Capacity

πŸ“‹ Project Overview

Prologis Park, Unit B - Solar Panels is a 0.99 MW solar farm project in London. The applicant or operator on record is Redcentric. The planning application was refused. The determining authority is Hounslow, reference P/2024/1582.

Site Schematic

SUBSTATION ? ha Β· 0.99 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.990 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRedcentric
Owner / operatorRedcentric
LocationPrologis Park, Unit B, Green Lane, Hounslow, London, TW4 6ER
RegionLondon
Coordinates51.4676838Β°N, 0.3949548Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Are they re-applying (Old REPD Ref) 14175

πŸ“… Project Timeline

2024-05-21