Solar Farm

Progress Way - Solar Panels

Progress Way, Lancashire, FY4 5DN

Progress Way - Solar Panels is a 0.2 MW solar farm project in North West. The applicant or operator on record is Corbenyah Properties Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Blackpool, reference 22/0691.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2022-10-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Registered Capacity

πŸ“‹ Project Overview

Progress Way - Solar Panels is a 0.2 MW solar farm project in North West. The applicant or operator on record is Corbenyah Properties Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Blackpool, reference 22/0691.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCorbenyah Properties Limited
Owner / operatorCorbenyah Properties Limited
LocationProgress Way, Lancashire, FY4 5DN
RegionNorth West
Coordinates53.7819213Β°N, 3.0183023Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)4430.54

πŸ“… Project Timeline

2022-09-27