Princes Foods,Raw Materials Warehouse Bridge Road - Solar Photovoltaic System is a 0.72 MW solar farm project in East Midlands. The applicant or operator on record is Princes Limited. Planning permission has been granted as of March 2023 and it is awaiting construction. The deter…

Consented / Approved
1 MW
Installed Capacity

πŸ“‹ Project Overview

Princes Foods,Raw Materials Warehouse Bridge Road - Solar Photovoltaic System is a 0.72 MW solar farm project in East Midlands. The applicant or operator on record is Princes Limited. Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is South Holland, reference H10-0052-23.

Site Schematic

SUBSTATION ? ha Β· 0.72 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPrinces Limited
Owner / operatorPrinces Limited
Year consented2023
LocationPrinces Foods (Raw Materials Warehouse), Bridge Road, Long Sutton, Spalding, Lincolnshire, PE12 9EQ
RegionEast Midlands
Coordinates52.7780499Β°N, 0.1468943Β°E