Princes Foods Pack Room, Bridge Road - Solar Panels is a 0.56 MW solar farm project in East Midlands. The applicant or operator on record is Princes Limited. Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is South β¦
Consented / Approved
Project stageConsented
PlanningJan 2023 (completed)
ConsentedMar 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-03-21.
Registered planning capacity; not measured generation.
Princes Foods Pack Room, Bridge Road - Solar Panels is a 0.56 MW solar farm project in East Midlands. The applicant or operator on record is Princes Limited. Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is South Holland, reference H10-0053-23.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.