π Project Overview
Preston Farm, Preston Candover - Solar PV Array is a 28 MW solar farm project in South East. The applicant or operator on record is BSR Energy. Planning permission has been granted as of September 2022 and it is awaiting construction. The determining authority is Basingstoke and Deane, reference 21/03398/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 28 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | BSR Energy |
| Owner / operator | BSR Energy |
| Year consented | 2022 |
| Location | Preston Candover Church Lane Preston Candover, Hampshire, RG25 2DS |
| Region | South East |
| Coordinates | 51.1793937Β°N, 1.1602096Β°W |