Port Talbot Renewable Energy Plant is a 350 MW bioenergy / waste project in Wales. The applicant or operator on record is Orthios Group. The application has been withdrawn or the scheme abandoned. The determining authority is Neath Port Talbot.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2007 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-10-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

350.000 MW
Registered Capacity

πŸ“‹ Project Overview

Port Talbot Renewable Energy Plant is a 350 MW bioenergy / waste project in Wales. The applicant or operator on record is Orthios Group. The application has been withdrawn or the scheme abandoned. The determining authority is Neath Port Talbot.

πŸ”§ Technical Specifications

Capacity (MW)350.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperOrthios Group
Owner / operatorOrthios Group
Year consented2007
LocationPort Talbot, West Glamorgan
RegionWales
Coordinates51.5866419Β°N, 3.7868175Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2006-10-23
2007-11-21