π Project Overview
Port of Tyne is a 35 MW battery storage project in North East. The applicant or operator on record is Foresight. It is recorded as operational since July 2018. The determining authority is South Tyneside, reference ST/0867/16/FULΒ .
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 35 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Foresight |
| Owner / operator | Foresight |
| Construction started | 2018 |
| Commissioned / target | 2018 |
| Location | Port of Tyne, Tyne Dock, South Shields, Tyne & Wear, Tyne and Wear, NE34 9PT |
| Region | North East |
| Coordinates | 54.9772663Β°N, 1.4559135Β°W |