Heysham Port North Quay Heysham Harbour Heysham Morecambe Lancashire LA3 2XF, Lancashire
Port Of Heysham Wind Farm is a 9 MW onshore wind project in North West. The applicant or operator on record is Peel Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Lancaster, reference 11/00816/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningSep 2011 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2014-01-10.
Registered planning capacity; not measured generation.
Port Of Heysham Wind Farm is a 9 MW onshore wind project in North West. The applicant or operator on record is Peel Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Lancaster, reference 11/00816/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
9.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Peel Energy
Owner / operator
Peel Energy
Location