Porsche Centre, Old Tiffield Road, Towcester, Northamptonshire, NN12 6PF
Porsche Centre, Old Tiffield Road - Solar Panels is a 0.22 MW solar farm project in East Midlands. The applicant or operator on record is Sytner Group Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Westβ¦
Consented / Approved
Project stageConsented
PlanningMar 2026 (completed)
ConsentedApr 2026 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-05-12.
Registered planning capacity; not measured generation.
Porsche Centre, Old Tiffield Road - Solar Panels is a 0.22 MW solar farm project in East Midlands. The applicant or operator on record is Sytner Group Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is West Northamptonshire, reference 2026/1175/PA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.220 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Sytner Group Limited
Owner / operator
Sytner Group Limited
Year consented
2026
Location
Porsche Centre, Old Tiffield Road, Towcester, Northamptonshire, NN12 6PF