PONTRILAS BIOMASS POWER PLANT

The Sawmills, Pontrilas, Hereford, Hereford and Worcester, HR2 0BE

PONTRILAS BIOMASS POWER PLANT is a 10 MW bioenergy / waste project in West Midlands. The applicant or operator on record is James Barr Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Herefordshire, County of, reference DCSW2006/3693/N…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningNov 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJan 2007 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2013-04-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.000 MW
Registered Capacity

πŸ“‹ Project Overview

PONTRILAS BIOMASS POWER PLANT is a 10 MW bioenergy / waste project in West Midlands. The applicant or operator on record is James Barr Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Herefordshire, County of, reference DCSW2006/3693/N.

πŸ”§ Technical Specifications

Capacity (MW)10.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperJames Barr Ltd
Owner / operatorJames Barr Ltd
Year consented2007
LocationThe Sawmills, Pontrilas, Hereford, Hereford and Worcester, HR2 0BE
RegionWest Midlands
Coordinates51.9520433Β°N, 2.868586Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2006-11-23
2007-01-29