Pont Yr River is a 0.6 MW conventional hydro project in Wales. The applicant or operator on record is Private Developer. The planning application was refused. The determining authority is Gwynedd, reference NP5/59/495A.…

Refused
Project stageRefused
  1. PlanningOct 2018 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2019-04-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.600 MW
Registered Capacity

πŸ“‹ Project Overview

Pont Yr River is a 0.6 MW conventional hydro project in Wales. The applicant or operator on record is Private Developer. The planning application was refused. The determining authority is Gwynedd, reference NP5/59/495A.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 0.600 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPrivate Developer
Owner / operatorPrivate Developer
LocationLand Near Pont Yr, Afon Gam, Blaenau Ffestiniog, Gwynedd, Conwy, LL41 4PT
RegionWales
Coordinates52.9530384Β°N, 3.9001165Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2018-10-19