Plymouth Energy Park Biomass CHP is a 10.8 MW bioenergy / waste project in South West. The applicant or operator on record is REACT Energy (Kedco). The application has been withdrawn or the scheme abandoned. The determining authority is Plymouth, reference 14/01637/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2014-12-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.800 MW
Registered Capacity

πŸ“‹ Project Overview

Plymouth Energy Park Biomass CHP is a 10.8 MW bioenergy / waste project in South West. The applicant or operator on record is REACT Energy (Kedco). The application has been withdrawn or the scheme abandoned. The determining authority is Plymouth, reference 14/01637/FUL.

πŸ”§ Technical Specifications

Capacity (MW)10.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperREACT Energy (Kedco)
Owner / operatorREACT Energy (Kedco)
LocationErnesettle Lane, Plymouth, Devon, PL5 2TT
RegionSouth West
Coordinates50.421707Β°N, 4.1888176Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2014-09-03