Bioenergy / Waste

Pitwherry Bridge

Land South West Of West Farm, Foston Road, Beeford, Driffield, Humberside

Pitwherry Bridge is a 3.3 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Gascorp. The planning application was refused. The determining authority is East Riding of Yorkshire, reference 15/02870/STPLF.…

Refused
Project stageRefused
  1. PlanningSep 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2016-05-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.300 MW
Registered Capacity

πŸ“‹ Project Overview

Pitwherry Bridge is a 3.3 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Gascorp. The planning application was refused. The determining authority is East Riding of Yorkshire, reference 15/02870/STPLF.

πŸ”§ Technical Specifications

Capacity (MW)3.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGascorp
Owner / operatorGascorp
LocationLand South West Of West Farm, Foston Road, Beeford, Driffield, Humberside
RegionYorkshire and Humber
Coordinates53.974911Β°N, 0.3022587Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2015-09-30