Bioenergy / Waste

Pineham AD Plant (Waste AD)

Land To The Right of Portway Pineham Milton Keynes, Buckinghamshire

Pineham AD Plant (Waste AD) is a 1 MW bioenergy / waste project in South East. The applicant or operator on record is Renewable Power Systems. The application has been withdrawn or the scheme abandoned. The determining authority is Milton Keynes, reference 10/01181/MIN.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2015-10-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.000 MW
Registered Capacity

πŸ“‹ Project Overview

Pineham AD Plant (Waste AD) is a 1 MW bioenergy / waste project in South East. The applicant or operator on record is Renewable Power Systems. The application has been withdrawn or the scheme abandoned. The determining authority is Milton Keynes, reference 10/01181/MIN.

πŸ”§ Technical Specifications

Capacity (MW)1.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRenewable Power Systems
Owner / operatorRenewable Power Systems
Year consented2011
LocationLand To The Right of Portway Pineham Milton Keynes, Buckinghamshire
RegionSouth East
Coordinates52.0554166Β°N, 0.7077313Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2010-06-22
2011-10-12