Pilgrims Pre Preparatory School, Brickhill Drive, Bedford, Bedfordshire, MK41 7QZ
Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels is a 0.18 MW solar farm project in Eastern. The applicant or operator on record is Eco UK Group. Planning permission has been granted as of August 2025 and it is awaiting construction. The determining authority is Bβ¦
Consented / Approved
Project stageConsented
PlanningJun 2025 (completed)
ConsentedAug 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-08-26.
Registered planning capacity; not measured generation.
Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels is a 0.18 MW solar farm project in Eastern. The applicant or operator on record is Eco UK Group. Planning permission has been granted as of August 2025 and it is awaiting construction. The determining authority is Bedford, reference 25/01216/SPNJ.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.180 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Eco UK Group
Owner / operator
Eco UK Group
Year consented
2025
Location
Pilgrims Pre Preparatory School, Brickhill Drive, Bedford, Bedfordshire, MK41 7QZ